
Superintending Engineer PN to inspect the flood safety construction works being done by the Irrigation Department in the disaster affected old age. Rai reached the spot. He instructed to make progress in the works before the monsoon. During the inspection, he reprimanded for not getting satisfactory reply by the employees of the contractor present on the side. The Superintending Engineer directed the Executive Engineer that the RCC wall being built on the Dharmaganga river below the old temple be completed on priority basis. He also instructed to ensure the quality of construction works and to work according to the standards. During this, he said that no negligence of any kind will be tolerated, because the area has already suffered a disaster.